The present guide has been issued to assist the companies of the Textile-Clothing sector in the implementation of the standard XML document type “TWISTING COMMISSION ORDER”, providing all the instruction required for its use in the context of e-commerce between Yarn Subcontractors and their Customers shown in the enclosed diagram. All the rules required for the construction and validation of the document are embedded into the specific XML-Schema, which is detailed in section "Implementation guide".
| |
Generalities |
The Twisting Commission Order is used by a Yarn Producer to commit to a Subcontractor the twisting of yarn required to transform the material into yarn usable for fabric production. This work Order can include one or several operations of the twisting cycle. When the Issuer of the Commission requires different manufacturing operations in sequence to different Subcontractors, he can used this document not only as work order but also as a despatch order to send the semi-finished product to a successive Subcontractor As a general rule, the Twisting Commission Order specifies only the manufacturing technology (if required) and the characteristics of the end product of each operation and specifies the components used to manufacture that product It must be noted that this end product can be, in turn, a component for a successive manufacturing operation The definition of any "manufacturing parameters" is left to the Subcontractor; sometimes however these parameters can be specified by the Issuer of the Commission itself, that can define machines and machine parameters in the Commission Order
| |
Credits | This XML document has been realized with the funding of the Project TEX-WEAVE by Guido Cucchiara, PROGEMA - Gruppo SOI, supported by the XML-Lab (initiative of ENEA and Forum per la Tecnologia dell'Informazione). Subsequent developments in this document have been financed by the TQR consortium, partly self-financed by the partners and the eBIZ 4.0 project More information can be acquired in http://www.ebiz.enea.it. | |
Back compatibility | Unchanged | |
Document Code | G020 | |
Diagrams | + | |
Resources |
[Guide] [XML Schema] [JSON Schema] | |
Used in Processes |
|
|