Document Raw material Dyeing Order Change | ||
---|---|---|
Document | Raw material Dyeing Order Change | |
Description | Change to the Dyeing commission Order for a raw material | |
Release date | 05/11/2018 | |
Scope |
The present guide has been issued to assist the companies of the Textile-Clothing sector in the implementation of the standard XML document type “RAW MATERIAL DYEING ORDER CHANGE”, providing all the instruction required for its use in the context of e-commerce between Dyeing Subcontractors and their Customers shown in the enclosed diagram
All the rules required for the construction and validation of the document are embedded into the specific XML-Schema, which is detailed in section "Implementation guide".
| |
Generalities |
The Commissioner sends to the Subcontractor a Raw material dyeing Order Change any time he must modify some conditions of his previous Order (eg. to suspend operations already ordered) or amend errors. Basic function of the message is to replace an invalid Order with a valid Order, amending: - suppliable quantities - dates and places of delivery - prices The Order Change can show a number of lines different from the related Purchase Order, when variations/cancellations have occurred so as to create the splitting of an Order Line.
However the sum of the quantities of the lines in the Order Change (confirmed + varied + cancelled) must always not less than the sum of the quantities in the original Order.
When the quantity is change the original line must be splitted and the confimed amount and canceled amount should be explicited through the 'act' flag. | |
Credits | This document was produced by Guido Cucchiara for ENEA XML-LAB with the contribution of the IPSA Consortium and the Polytechnic University of Milan. Subsequent developments in this document have been funded by the eBIZ 4.0 project. | |
Back compatibility | Unchanged | |
Document Code | G067 | |
Resources |
[Guide] [XML Schema] [JSON Schema] | |
Used in Processes |
|
|